language
中国
韩国
韩国
韩国
韩国
韩国
×

Search

Search
News
news
Check category
/
/
/
Two systems for daily maintenance of thermal bonding machine

Two systems for daily maintenance of thermal bonding machine

(Summary description)Production machines are heavy oil machinery and equipment. When a failure occurs, it takes a long time to repair, so correct maintenance and failure prevention are required. The following are the two daily maintenance items of the vertical disc thermal bonding machine for your reference.

Two systems for daily maintenance of thermal bonding machine

(Summary description)Production machines are heavy oil machinery and equipment. When a failure occurs, it takes a long time to repair, so correct maintenance and failure prevention are required. The following are the two daily maintenance items of the vertical disc thermal bonding machine for your reference.

Information

Production machines are heavy oil machinery and equipment. When a failure occurs, it takes a long time to repair, so correct maintenance and failure prevention are required. The following are the two daily maintenance items of the vertical disc thermal bonding machine for your reference.

thermal bonding machine

1. Glue injection system

1. Persist in external cleaning of the appearance of the cylinder core, cylinder auxiliary column, material pipeline motor column, valve seat cylinder mandrel, etc., to prevent pollution from accumulating outside and hiding in the gaps of mechanical parts, affecting performance;

2. Regularly check the system nut to ensure its normal operation;

3. Take out some machinable plastics from the thread every three months, because some threads need to be coated with heat-resistant grease (red lead or molybdenum disulfide) at high temperature to avoid being worn to death;

4. Except for plastics, pigments and additives, other items shall not be put into the product to damage the screw and additives;

5. When the vertical disc thermal bonding machine does not reach the preset temperature, do not start the hydraulic motor to drive, spray glue or loosen, otherwise the screw head will be damaged;

2. Locking and template of thermal bonding machine

1. Strictly observe the external cleaning of the mandrel of the mold cylinder, the column of the mold cylinder and the upper and lower columns to prevent the accumulation of dirt, so as not to damage these parts during operation;

2. Control the pressure, speed and position adjustment of the parting stroke to reduce the impact so as not to damage the template and mold;

3. Open the mold every time you close it, so that the gap between the upper and lower molds sticks. If the mold is fully open, the machine will be in working condition, because the upper template and some self-weight are due to the mold. Affect the service life of components such as oil seal valves;

4. The auxiliary mold fixing screw can prevent the use of alloy screws with too high hardness. The depth of locking the vertical disc thermal bonding machine screw into the teeth must be greater than the corresponding depth, and the tightening torque must be appropriate. Before the mold is fixed, be sure to check whether the mold and the fixing surface are clean. Use a wipe if necessary.
 

Keyword:

Hot Spot

11-14
2022
What processes are needed to develop a new Direct injection shoe making machine products

If a shoe manufacturer wants to produce a pair of good shoes, it must first have a good direct injection shoe making machine products machinery and equipment, so what processes do we need to develop a new direct injection shoe making machine products?

11-07
2022
Two systems for daily maintenance of thermal bonding machine

Production machines are heavy oil machinery and equipment. When a failure occurs, it takes a long time to repair, so correct maintenance and failure prevention are required. The following are the two daily maintenance items of the vertical disc thermal bonding machine for your reference.

10-31
2022
Correct use and maintenance of steam machine for shoes making

Steam machine for shoes making is coated with anti-rust grease to prevent the parts from rusting before packing. Before use, the grease on the surface must be cleaned with gasoline and dried with a clean cotton gauze or soft cloth.

10-24
2022
How should the Intelligent automatic shoe production line be laid out

When the new shoe factory is established, what we need to consider is how to plan the layout of Intelligent automatic shoe production line. The layout is to reduce waste in the production process, and to emphasize on-site visual communication.

10-17
2022
What are the main features of Double-box type steam machine

In the shoe machine equipment industry, the main shoe-making equipment products are: various shoe-making lines, infrared bottoming production lines, ovens, rapid freezing setting machines, vacuum vulcanizers, moist heat setting machines, heel setting machines, Double-box type steam machine series, front machine, back machine, all kinds of bottom pressing machine, nailing machine, leather machine with blade, cutting machine, gluing machine, infrared oven, shoe machine accessories, other shoe-making shoe machines and various machinery Hardware accessories, etc.

10-10
2022
How the Fully automatic rotary PU injection machine manufacturer calculates the die thickness

How the fully automatic rotary PU injection machine manufacturer's computer monitors the stencil pressure: Describes how to monitor the stencil pressure. Deviation of clamping force: The vertical injection molding machine manufacturer of Taifu Machinery sets the deviation of clamping force. If it exceeds this deviation range, an alarm will be issued.

09-26
2022
How to choose a high-quality Fully automatic rotary PU injection machine

Purchasing a fully automatic rotary PU injection machine project is not a small investment project; buying a large injection molding machine is a waste, and buying a too small one is not suitable; therefore, it is easy to choose a fully automatic rotary PU injection machine that meets the needs of your own products.

09-14
2022
General safety precautions for maintenance and repair of quality thermal bonding machine

Before the maintenance and repair of the quality thermal bonding machine, the power supply on the PUR hot melt adhesive machine and the main power supply connected to the outside world must be cut off, and no live operation is allowed.

Our Mission

Technology leads the future, intelligent manufacturing changes manufacturing
logo
img
这是描述信息

Scan and follow us

Copyright of the page Xiamen Manyu Automation Technology Co., Ltd.     闽ICP备19024249号-1     300.cn    SEO

Copyright of the page Xiamen Manyu Automation Technology Co., Ltd. 

 闽ICP备19024249号-1   

300.cn    SEO

×